Center a 914 mm 36 width strip of an ice and water protector membrane in the valley.
Roofing shingles how to apply.
To start installing shingles line up aluminum drip edge flush with the edge of the roof and make a pencil line at the top on each end of the house.
Watch and see how easy it is.
Pull the drip edge down about a half inch from that line to create a gap between the drip edge and the fascia board.
Shingling a shed and want some tips.
The recommended flashing material is a 28 gauge galvanized metal or an equivalent corrosion resistant non staining material check with local codes.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Adhere the shingles adjacent to the flange with roofing tar.
Many pros shingle in a vertical line up the roof because it s much faster.
Handy home shows you universal shingling techniques that can be applied to any shed.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
Complete the application of underlayment and valley flashing before the roofing shingles are applied.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Starting at the bottom of the roof map out a guideline with chalk.
Adhere the joint where the cut edges of the shingles meet the dome with roofing tar.
How to do it prep work space.
Using the chalk line snap a line between the two marks to get a straight edge.
Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up and at.
Snap horizontal chalklines to help you keep the courses straight.
See below for a shopping list tools and steps subscr.
Install a starter strip.
Trim the shingles away from the ridge vent hole.
If possible have the shingles delivered via a boom directly onto the roof.